Equipment & Services

NEW IN 2015…


  • PDS BAR TECH – 6 Zone, fully automatic, electric resistance heat treating with a programmable simultaneous display 12 point recorder
  • PHASE II….MET-U1A50 ULTRASONIC HARDNESS TESTER

EXISTING EQUIPMENT:


  • CARBOTTOM TYPE FURNACE……….10’ WIDE x 10’ HIGH x 20’ LONG
  • TOOL ROOM FURNACES……….SIZES UP TO 20” WIDE x 18” HIGH x 36” LONG
  • FLAME HARDENING

Now Available


  • LARGE TYPE CARBOTTOM FURNACE…10’ WIDE x 10’ HIGH x 20’ LONG
    NEW FURNACE NOW ON LINE!

    NEW FURNACE NOW ON LINE!

CONVENTIONAL PROCESSES AVAILABLE:

 


  • QUENCH & TEMPER
  • TOOL STEEL HEAT TREATING
  • STRESS RELIEVE
  • NORMALIZE
  • ANNEAL
  • PRECIPITATION HARDENING
  • AGE HARDENING
  • FLAME HARDENING
  • REFRACTORY DRYOUT
  • NDT (NON DESTRUCTIVE TESTING)

UNIQUE PROCESSES AVAILABLE:

 


  • PRE & POST WELD HEAT TREAT (PHWT)
  • PRE PWHT – INVOLVES THE PRE HEATING OF AN AREA TO PREPARE IT FOR WELDING
  • PWHT – PERFORMED ON A DAILY BASIS. WHETHER IT’S A LARGE PRESSURE VESSEL, OR A SMALL PIPE SPOOL, CCHT CAN DO THE ENTIRE PART, OR LOCALIZE AND PHWT JUST ONE WELD!
  • ALL EQUIPMENT & RECORDING DEVICES ARE CALIBRATED ON A 6 MONTH BASIS AS REQUIRED BY CODE.PWHT IS PERFORMED TO VARIOUS ASME CODES, SUCH AS,
    ASME Boiler and Pressure Code, Section I, PW-39
    ASME Boiler and Pressure Code, Section VIII Division I, UCS-56
    ASME Code of Pressure Piping B31.1, Table 132
    ASME Code of Pressure Piping B31.3, 331